Judith Buethe Communications
HOMEEVENTSOUTREACHPROJECT WEBSITESOUR PEOPLEOUR CLIENTSPUBLIC RELATIONSCONTACT US
PROJECT WEBSITES

I-5/French Camp Interchange and Sperry Road Extension Project

The proposed project includes reconstruction of the Interstate 5/French Camp Road interchange, extension of Sperry Road from Performance Drive to French Camp Road, and relocation of Manthey Road. There are two build alternatives. The “Full-Build Alternative” includes the interchange and auxiliary lanes, an eight-lane Sperry Road extension, and relocation of Manthey Road. The “Reduced-Build Alternative” is the same as the Full-Build Alternative, but with only four lanes on Sperry Road. Both build alternatives would be designed to comply with the Americans with Disabilities Act of 1990. The build alternatives would reduce existing and projected traffic congestion by providing increased capacity, improve route continuity and reduce travel time and delay by improving east-west access to Interstate 5, thereby reducing demand on north-south roadways such as El Dorado Street, McKinley Road, and D\Airport Way; and improve freeway operations by increasing capacity at the French Camp Road interchange and constructing auxiliary lanes between French Camp Road and Downing Avenue; and improve traffic safety by reducing congestion in the project area. The project is located in San Joaquin County. The Project limits on Interstate 5 are from the Interstate 5/Downing Avenue Interchange to 600 meters (2,000) feet south of the Interstate 5/French Camp Road Interchange. The western project limit is approximately 365 meters (1,200 feet) west of the Manthey Road/Henry Long Boulevard intersection, and the eastern project limit is approximately 180 meters (590) feet east of the Sperry Road/Performance Drive intersection.

A public workshop has been scheduled for 6:30pm, April 5, 2006, at Great Valley Elementary School, 4223 McDougald Boulevard, Stockton, California.

Following is the Draft Environmental Impact Report for the I-5/French Camp Interchange and Sperry Road Extension Project.

Environmental Impact Report:

Description type Size
01-Cover-FrontMatter 11-22-05.pdf PDF 269 Kb
02-Signed Title Page.pdf PDF 38 Kb
03-Summary 11-22-05.pdf PDF  68 Kb
04-TOC_11-22-05.pdf PDF 92 Kb
05-Ch01 PurpNeed_11-22-05.pdf PDF 2.6 Mb
06-Ch02 Project Alternatives_11-22-05.pdf PDF 6.8 Mb
07-Ch03_11-22-05.pdf PDF 17.6 Mb
08-Ch04 Cumulative_11-22-05.pdf PDF 54 Kb
09-Ch05CEQAEval_11-22-05.pdf PDF 102 Kb
10-Table 5.1_11-22-05.pdf PDF  220 Kb
11-Ch06_comm_coord_11-22-05.pdf PDF  57 Kb
12-Ch07_LOP 11-22-05.pdf PDF  43 Kb
13-Ch08 Distribution List_11-22-05.pdf PDF  120 Kb
14-Ch09_References_11-22-05.pdf PDF  93 Kb
App A_CEQAChecklist.pdf PDF  103 Kb
App B_Title VI_11-22-05.pdf PDF  126 Kb
App C_Relocation Benefits_11-22-05.pdf PDF  53 Kb
App D_Noise_11-22-05.pdf PDF 89 Kb
App E_Agency Coordination_11-22-05.pdf PDF 2.2 Mb
App F_Farmland_11-22-05.pdf PDF 77 Kb
App G_MitMonCommitments_11-22-05.pdf PDF 174 Kb